What is required for dry removal of asbestos per 29 CFR section 1926.1101?

Master the Asbestos Certified Site Surveillance Technician Exam. Study with flashcards and multiple choice questions, with hints and explanations. Ace your certification!

The requirement for specific EPA approval for dry removal of asbestos is based on regulatory measures aimed at ensuring safety and compliance during asbestos abatement activities. Under the Clean Air Act, and more specifically through the National Emission Standards for Hazardous Air Pollutants (NESHAP), any removal of asbestos must receive proper authorization from the EPA when it involves significant quantities or specific types of asbestos-containing materials. This regulation emphasizes environmental protection and public health by ensuring that any work conducted involving asbestos does not release harmful fibers into the air without oversight.

In contrast, while special training, notifications to the state, and dust control measures are all significantly important aspects of asbestos removal practices, they do not specifically address the regulatory requirement for obtaining EPA approval prior to dry removal. Thus, understanding that EPA approval is a crucial step ensures that necessary precautions are taken to mitigate health risks associated with asbestos exposure.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy